Skip to product information
1 of 9

4G Dog GPS Tracker with Real-Time Location, Runaway Alerts, Activity Monitoring App, Waterproof Design & Rechargeable LED Dog Collar with 7 Color Modes, 27-Month Subscription Included – Black Bundle

4G Dog GPS Tracker with Real-Time Location, Runaway Alerts, Activity Monitoring App, Waterproof Design & Rechargeable LED Dog Collar with 7 Color Modes, 27-Month Subscription Included – Black Bundle

Quantity
Regular price $44.77
Regular price Sale price $44.77
Sale Sold out
  • 24/7 Customer Support
  • Risk-Free 30-Day Returns
  • Fast & Reliable U.S. Shipping

30-Day Hassle-Free Returns

Not satisfied? Return your order within 30 days for a full refund or exchange — simple and easy.

✔ Easy return process

✔ Fast refunds

✔ No hidden conditions

Fast U.S. Shipping

We ship within the United States only — no international delays.

✔ Processing time: 1–2 business days

✔ Delivery time: 3–7 business days

✔ Real-time tracking available

👉 Track your order anytime from the header via Track Order

About This

  • 3 MONTHS PREMIUM SUBSCRIPTION INCLUDED – Includes 3 months of Premium service and then 2 years of Lite service, so you can start tracking right away. After the included period ends, a paid subscription is required to continue the service; please see the product images for full plan details.
  • ALWAYS KEEP AN EYE ON YOUR DOG: With precise real-time GPS tracking, you can check your dog’s location anytime directly from the app. If your dog ever runs away, you’ll receive an instant alert as soon as they leave the safe zone you’ve set — for maximum control and peace of mind.
  • VISIBILITY & SAFETY IN THE DARK – THE PERFECT COMBINATION: Combine high visibility with real-time tracking! The bright LED light-up collar ensures excellent visibility at night, while the GPS tracker adds an extra layer of protection — double safety through tracking and visibility.
  • 100% WATERPROOF & DURABLE: Rain, snow, mud, or even a jump into the water — both the GPS tracker and LED collar are fully waterproof and work reliably in all weather conditions. Ideal for active dogs and outdoor adventures.
  • LIGHTWEIGHT, FLEXIBLE & PERFECT FOR EVERYDAY USE: The compact and lightweight GPS tracker (only 1.7 oz / 48 g) easily attaches to any collar or harness using pet-friendly hook-and-loop fasteners. The LED collar (adjustable 8–28 inches) offers 7 colors, multiple light modes (steady or flashing), and can be custom-cut for a perfect fit.

Overview

  • Color : Black
  • Brand : PAJ GPS
  • Closure Type : Hook and Loop
  • Breed Recommendation : X-Small, Medium, Large
  • Number of Items : 1
View full details

Tired of Waking Up Hot and Uncomfortable?

Overheating, rough fabrics, and poor-quality bedding can ruin your sleep — night after night.

Most people don’t realize that poor-quality bedding traps heat and blocks airflow, leading to restless nights and constant discomfort.

Synthetic fabrics, low breathability, and heavy materials can make your bed feel warm, sticky, and irritating — especially during warmer nights.

If you’re constantly searching for “cooling bedding” or “best sheets for hot sleepers,” you’re not alone.

❄️ DESIGNED FOR HOT SLEEPERS

🌿 SAFE & BREATHABLE MATERIALS

⭐ 10,000+ HAPPY CUSTOMERS

😴 85%+ OF CUSTOMERS REPORT BETTER SLEEP

Sleep Better, Live Better

WHY CHOOSE OUR BEDDING?

help_outline   ━━ Why us?
Most bedding only looks good. Ours is built to perform — breathable, cooling, and made to improve your sleep every single night.

92%

CUSTOMERS SLEEP COOLER

1000+

BEDDING SETS SOLD

100%

OEKO-TEX® CERTIFIED MATERIALS

30+

30-Night Sleep Guarantee

Transform Your Sleep in Just One Night

compare   ━━ before & after

Most bedrooms look fine — but feel uncomfortable.

Our breathable, cooling bedding instantly changes how your bed feels, helping you sleep deeper and wake up refreshed.

Cooling Comfort 95 %
Airflow & Softness 90 %

Sustainable Comfort for Everyday Living

Organic & Safe Materials

Eco-Friendly Production

Long-Lasting Quality

Frequently Asked Questions About Bedding Sets

What is included in a bedding set?
remove
add
Most bedding sets include a comforter or duvet cover, pillowcases, and sometimes fitted or flat sheets. Some premium sets may also include shams or decorative pillows. Always check product details for exact contents.
What is the best material for bedding?
remove
add
Cotton is the most popular bedding material because it is soft, breathable, and durable. Organic cotton and cooling fabrics are great options for comfort and temperature control.
How do I choose the right bedding size?
remove
add
Choose based on your mattress size (Twin, Full, Queen, King). For a more luxurious look, you can size up for extra coverage.
What is the difference between a comforter and a duvet?
remove
add
A comforter is ready to use, while a duvet requires a cover. Duvets are easier to clean since you only wash the cover.
How often should I wash my bedding?
remove
add
Sheets should be washed weekly, while comforters or duvet covers can be washed every 2–4 weeks depending on use.
What bedding is best for hot sleepers?
remove
add
Cooling and breathable materials like cotton, bamboo, or moisture-wicking fabrics help regulate temperature and improve sleep comfort.

Premium organic bedding sets, cooling comforters, luxury hotel sheets, and breathable cotton bedding designed for modern American homes. Available in Twin, Queen, King, and California King sizes.

contactless

Premium organic bedding sets, cooling comforters, luxury hotel sheets, and breathable cotton bedding designed for modern American homes. Available in Twin, Queen, King, and California King sizes.

contactless
Free Shipping
On orders over $99
90-Day Returns
Hassle-free returns
Secure Payment
100% protected checkout
24/7 Support
Always here to help
Smartphone with email subscription interface on a table with a cup of coffee and plant.

Unlock Exclusive Offers

Be the first to know about new collections and exclusive offers.

Subscribe Now